logo

Photovoltaic Twin Core Solar Cable With Tinned Copper Conductor XLPO Insulation

Basic Properties
Place of Origin: Hebei, China
Brand Name: Minfeng
Certification: ISO,CE,IEC,TUV,KEMA
Model Number: Solar Cable
Trading Properties
Minimum Order Quantity: 100
Price: 0.1-5
Payment Terms: L/C,T/T
Supply Ability: 100KM/Week
Specifications
Free Sample: Avaliable Rate Voltage: 1KV AC 1500V DC
Insulation: XLPO Male End Type: CEE, CEE/16 3 Prong Schuko Plug
Trademark: Minfeng Condutor: Tinned Copper
High Light:

Photovoltaic Twin Core Solar Cable

,

PV Twin Core Solar Cable

Product Description
Solar Cable Twin Double Dual 2*2.5MM² 2*4MM² 2*10MM²

High-performance photovoltaic cables designed for solar power systems, industrial applications, power stations, and construction projects.

Technical Specifications
Rated Voltage 1000V, 1.5kV
Available Sizes 2.5mm² - 10mm²
Conductor Material Tinned copper
Insulation Material XLPO
Jacket Material XLPO
Rated Current 16A, 20A, 25A, 30A, 40A, 50A, 60A
Temperature Rating 125℃
Maximum Short-Circuit Temperature 250℃
Product Lifespan 30 Years
Standard TUV
Performance Characteristics
  • Dielectric strength: DC-15KV/1 sec MIN
  • Spark test: DC-10KV/In the air
  • Weathering/UV-resistance: 720h, No cracking
  • Elongation of unaged values: ≥125%
  • Tensile strength of unaged values: ≥6.5
  • Elongation after aging: ≥70%
Product Details
Model Number Solar Cable / Twin core Photovoltaic Cable PV1-F / H1Z2Z2-K
Brand Name Minfeng
Color Red Black
Wire Size 2*2.5mm² / 2*4mm² / 2*6mm²...
Rated Temperature -45°C to 90°C
Rated Voltage AC: 0.6-1.0kV / DC: 1.0-1.8kV
Bending Radius 5* overall diameter
Maximum Conductor Temperature +120°C (for 20000h)
Life Period >30 years
Place of Origin Hebei, China
Product Gallery
Overall Rating
5.0
★★★★★
★★★★★
Based on 50 reviews recently
5 star
100%
4 star
0
3 star
0
2 star
0
1 star
0
All Reviews
  • P
    Panya Vera
    Congo Feb 23.2024
    ★★★★★
    ★★★★★
    High-performance cables at a very competitive price point. They offer the perfect balance of reliability and cost-efficiency for our large-scale infrastructure projects.