8.7/15KV Voltage EPR Insulated CPE Jacket Mining Shielding Rubber Flexible Cable for Tunneling Boring Machines
基本プロパティ
原産地:
河北省、中国
ブランド名:
Minfeng
認定:
ISO,CE,IEC,TUV,KEMA
モデル番号:
ゴムケーブル
取引物件
最低注文数量:
100
価格:
0.1-5
支払い条件:
LC、T/T
補給能力:
100km/週
仕様
| Manufacturer: | 民豊ケーブルグループ | Insulating Type: | EPR |
| Cable type: | フレキシブル | Voltage: | 8.7/15kv |
| Cable Jacket: | CPE | Model Name: | UGFP UGEFP UGEFHP |
| Free Sample: | 利用可能 | Conductor Material: | 錫メッキ銅。 IEC 60228 クラス 2 |
製品の説明
UGFP UGEFP UGEFHP EPR 6/10kV 8.7/15kV EPR Insulated CPE Jacket Mining Shield Shielding Tunneling Boring Machine TBM Rubber Cable
Product Overview
Model Number
UGFP UGEFP UGEFHP
Brand Name
Minfeng
Conductor Material
Copper
Insulation Material
EPR
Jacket Material
Rubber
Application
Construction
Core Configuration
3+3 Cores
Minimum Order Quantity
100 Meters
Place of Origin
Hebei, China
Product Description
8.7/15KV Rubber Flexible UGEFP CPE Jacket EPR Insulated Copper Trailing Mining Cable
Application: As power feeder cable in underground mines and in tunnel sites. The cables are used in underground festoon systems for the power supply of mobile transformer and shiftable units in underground mining applications.
Product Parameters
| Cores × Normal Cross-sectional Area mm² | Approx. Overall Diameter mm | Approx. Weight kg/km | 20℃ Phase Core Insulation Resistance ≥MΩ·km |
|---|---|---|---|
| 3×16+1×16 | 58.5-63.5 | 4648 | 610 |
| 3×25+3×10 | 56.2-61.2 | 5168 | 550 |
| 3×35+3×10 | 59.2-64.2 | 5861 | 500 |
| 3×50+3×16 | 63.1-68.1 | 7166 | 440 |
| 3×70+3×16 | 69.5-74.5 | 8771 | 390 |
| 3×95+3×16 | 74.0-79.0 | 10126 | 350 |
| 3×120+3×25 | 79.0-84.0 | 11827 | 330 |
| 3×150+3×25 | 83.3-88.3 | 13554 | 300 |
| 3×185+3×35 | 87.6-93.6 | 15489 | 280 |
総格付け
最高
100%
4つ星
0
3つ星
0
2つ星
0
星1つ
0
All Reviews
-
GThe LSZH (Low Smoke Zero Halogen) properties of these cables are exactly as advertised. They performed exceptionally well during our fire safety compliance audit.
-
IOur field technicians have specifically requested this brand because the cable is easy to strip and pull through conduits, saving us significant man-hours on-site.
